Through type shot blasting machine safety operation
First, turn the power front view, shift records;
Second, the necessary security checks, indoor wear nursing board examination;
3, loading the workpiece;
4, and then click open the fan, pill sand separator, elevator, the bottom of the screw conveyor, back to pills auger (with high pressure cleaning should also be open) shot device 1-8 (respectively, a current meter to be reset before the next re-start Taiwan, or easily damaged motor), roller conveyor (adjusted the speed of a walk) for the pill gates (to be body parts into the room);
5, timely inspection of all units Shot Current readings to 15-20 as well; and check the blast wheel vibration situations, such as vibration of large should check the wear of the impeller blades.
6, normal upper and lower parts, cycle work.
7, when the cleaning roller shut down after the turn, blast wheel, back pill auger, the bottom of the screw conveyor, elevator, pill sand separator, blower for 1-2 minutes after the start of vibration cleaning stick in the bag on the dust work to clean up the garbage heap.
8, regular observation of gear case lubrication of fan bearings;
9, for any repairs should be cut off the mains.

Crawler shot blasting machine safety operation
First, turn the power front view, shift records;
Second, set working hours, work can not adjust the time before shutdown;
3, Bahrain jobs, open the door to see whether the parts inside the chamber, the normal turn, stop, close;
4, followed by open fan, track forward, shot blasting, lifting machine;
5, set the time that the track is only a fan switch work;
6, open the door, reverse the workpiece track;
7, upgrade with, track tension should be maintained and, if loose, tension in time. Can not be offset, if offset, in time than now;
8, to observe the marked slowdown in oil is short of petroleum;
9, for any repairs should be off the power.
Track shot blasting machine repair and maintenance
1. Always check inside the rubber track shot blasting room, interior linings, etc., should be immediately replaced after wear.
2. Regularly check the wear of blast wheel inside, wear over the limits that should be replaced, especially leaves, directed sets, sub-pill wheel and impeller should pay attention to, if not promptly replaced, would generate abnormal vibration, ability to shot down, also whole body vibration. Another blast wheel liner wear, if serious, it should be replaced, otherwise the blast shell of easy to wear, or even breakdown, causing the projectile flying machine, the harmful environmental and personal safety.
3. Shot blade replacement, be sure to balance and shot blasting chamber orientation sets the adjustments. Replacement blades, generally the opposite direction is symmetrical to replace the two blades, the weight must be equal.
4. Regularly check whether the oil seal leakage, regular open repair blast wheel spindle.
5. Regular cleaning both inside and outside the body to keep clean. Dust regularly inspected bodies, with particular attention to parts of the bearing to prevent the dust into the bearings inside the bearing damage.
6. Lubrication of the machine is properly will seriously affect the life and good machine performance and must therefore be carried out step by step correct lubrication and maintenance, please press the table Lubrication:
Lubrication oil lubrication time point
100 hours of high-speed motor bearing lubrication
Cycloid reducer oil as the oil above 60 # set foot line
Chain lubricants for more than 60 # 1 month
Side plate bearing grease for six months
Other bearing grease 1 month

Through type shot blasting machine
a. machines should be regularly inspected, attention to care and regular lubrication.
b. when the overhaul is strictly prohibited tools, screws and other debris left in the machine.
c. prohibited pit moisture, prevent rust caking projectile, not the machine, such as long-term operation of the machine should be regularly start half an hour.
d. operation of the machine should be regularly removed separator, filter the waste, to ensure normal operation of equipment.
2. Before and after the machine operation
a. nursing board examination before operation, rubber curtain wearing parts such as wear, change in time.
Check all moving parts b. coordination, bolt connection is loose, tighten a timely manner.
c. Check for debris falling into the machine, cleaning prevent blockage in time to check whether the specification of all parts of lubrication.
d. indoor boot should be determined before, no one can start the Import and Export.
e. To operate correctly in accordance with the electrical operation rules.
3. Check operation
a. Always check the operation of the quality of parts cleaning, if necessary, adjust the projection angle and the projectile speed of the workpiece carrier.
b. whether the workpiece deviation observed in operation in time to adjust.
c. Note that blast wheel vibration and sound operation of whether it is normal, bearing and motor heat up the situation, when there is abnormal shutdown inspection, troubleshooting and replacement blades.
4. Security
a. Non-operating and maintenance personnel shall not operate.
b. repair must be cut off the power, and warning mark hanging prominently.
c. rubber curtains, and dust and so avoid open flames.
d. protective cover such as operating the machine must be securely installed. 
http://dict.baidu.com/s?wd=shot+blasting+machine
 
语法标注解释 shot blasting machine

 

以下结果来自互联网网络释义

shot blasting machine
1.
抛丸清理机
进出口专业英语词汇(S3)-外贸英语-外贸...
shot blasting machine 抛丸清理机

http://www.cn176.com/...

shot-blasting machine
1.
喷粒机
铸造学专业英语词汇(17)—生命经纬
喷粒机
shot-blasting machine

 

http://www.youku.com/playlist_show/id_4220542.html
e. When power failure occurs, the total power to cut off the machine. 
With over 20years developing, HI-POWER is one of the leading manufactures of surface preparation equipments and tools in Asia now; our products are being exported to many countries. We have passed ISO9001: 2000 certificate, some products acquires CE certificate. With a te... 全部专辑信息
标签:
floorgrindershotblastingMachine>>
 
http://www.mecshot.net/
 http://www.mecshot.net/company_profile.aspx
Company Profile
MEC SHOT was established in 1992, under the dexterous leadership of Mr. A.K. Modi - Managing Director. He gave new direction to the field of manufacturing air operated and airless shot blasting / peening machines.

The various milestones achieved since then are:
  • ISO 9001:2008 Quality Management System standard
  • ‘CE’ Mark for Product Quality by EUROCERT-Greece
  • ISO 14001:2004 Environmental Management System standard
  • ISO 18001 OSHA’S for Safety, Health & Environment Standard (Pursuing)